Cheap if you only count the cost of plopping them down and walking away, the train could kick up enough dust and debris that efficiency is impacted significantly more than installing them on a roof would have been, necessitating installing new ones sooner.
It’s all theory. That’s why I think it’s worth a try and learn the facts.
Edit: A rough estimation with averages: 10 kWp gives 11kwh a year in Swiss, 1kwp panel costs 500€, 1kwh energy costs 0,28 EUR in Swiss. Panel material costs for 10 kWp is 5,000€ and earns you 3,080€ (11,000*0,28€) yearly. This shows the value of the idea.
Cheap if you only count the cost of plopping them down and walking away, the train could kick up enough dust and debris that efficiency is impacted significantly more than installing them on a roof would have been, necessitating installing new ones sooner.
It’s all theory. That’s why I think it’s worth a try and learn the facts.
Edit: A rough estimation with averages: 10 kWp gives 11kwh a year in Swiss, 1kwp panel costs 500€, 1kwh energy costs 0,28 EUR in Swiss. Panel material costs for 10 kWp is 5,000€ and earns you 3,080€ (11,000*0,28€) yearly. This shows the value of the idea.
What if the train runs a street sweeper brush behind it to clean them off every time?